Developer’s condition Trigger pipes: plastic
Insulation of the attic: mineral wool 20 cm thick
Ceiling: made from PCV
Ceiling suspended on the floor: plaster-cardboard plate 12 mm thick
Elevations: external walls insulated with foamed polystyrene 14 cm thick, mineral plaster
thin-layer or traditional, colour of the elevation according to the client’s request
External window sills: steel sheet metal coated
Finishing of the walls and ceilings: cement-limestone plaster painted twice with the white acrylic paint
Finishing of the floors: insulation in the form of foamed polystyrene 8 cm thick on the ground floor, acoustic insulation with foamed polystyrene 3 cm on the floor, floor finishing 5 cm thick, prepared for the parquet.
In the bathroom, toilet and kitchen – floor finishing prepared for the terracotta.
Lack of door frames and internal door; balcony windows and doors glazed with the two-pane set,
opened-set ajar; window sills from the conglomerate
Outside door: anti-burglary, insulated, locker with the key
Garage door: coffered controlled with the remote control.
Installations:
- Hot usable water and central heating
- heating: radiators, without gas boiler
- sewage system: PCW pipes
- gas for the furnace and oven: copper and steel
- electrical: distribution according to the documentation
- sanitary: supply of cold and hot water in the kitchen, bathroom and toilet,
without so called "white installation", draining sanitary sewage from all fittings for the ecological adjacent sewage treatment plant - water internal: PCV pipes
- external water supply: from the existing water-pipe network
- gravitational ventilation: brick vertical channels in the determined rooms
Teletechnical installations: entry phone, doorbell
Sling: from cobblestones around the building
Access to the garage from the cobblestone; the colour agreed with the Client